The Grinnell sewer project
Groundwater was entering a damaged sewer serving Grinnell's Melrose Lift Station. We located the defect with CCTV, repaired it from inside the existing pipe, and inspected the completed point repair.
Lower average daily effluent
Observed over 6 days before and 3 days after repair. Other conditions can also affect flow.