CIT Sewer Solutions
An inspection frame showing a service connection entering the main, with the survey reference data recorded across the top.

Resources

Find specifications for your sewer project.

Use manufacturer documents, inspection guidelines and planning checklists to prepare your city’s sewer inspection, cleaning or rehabilitation project.

  • Find technical documents by service and manufacturer.
  • Open specification sheets, checklists and crew references.

Document library

Choose the references for the sewer assets you manage.

Search by manufacturer, product or service. Open PDFs directly from their publishers, compare specification guidelines, and find references for inspection reports and maintenance planning.

Confirm the equipment and materials specified for your project.

  • Manufacturer model sheets describe available configurations.
  • Your project submittal identifies the equipment, liner or grout proposed for the job.
  • Use safety references with the actual product instructions and your employer’s site procedures.

Specifications and field references

Search the sewer document library.

Filter the library by service or document type. Document dates identify the publisher’s edition where available; the check date records when we verified the link.

49 / 49 documents shown

  • IBAK

    PDF

    IBAK sewer inspection systems: mainline and lateral equipment (opens in a new tab)

    Equipment brochure · 45 pages · 25.9 MB

    Compare cameras, crawlers and lateral-launch equipment described in the manufacturer’s inspection catalogue.

    Application notes

    Manufacturer model reference. Confirm the equipment and options proposed for your project.

    CCTV and lateral launchSewer locatingCross-bore inspection

    Link checked: 2026-09-20

  • IBAK

    Web page

    IBAK LISY lateral-launch system (opens in a new tab)

    Technical guide

    Read how a camera launches from the sewer main into an accessible lateral.

    Application notes

    Manufacturer model reference. Confirm the equipment and options proposed for your project.

    CCTV and lateral launchCross-bore inspection

    Link checked: 2026-09-20

  • Vactor

    PDF

    Vactor 2100i combination sewer cleaner (opens in a new tab)

    Equipment brochure · 12 pages · 0.8 MB

    Review the jetting, vacuum, tank and control configurations available in the 2100i range.

    Application notes

    Manufacturer model reference. Confirm the equipment and options proposed for your project.

    Cleaning and jettingAnnual maintenance

    Edition: April 2025

    Link checked: 2026-09-20

  • Vactor

    PDF

    Vactor 2100i operator’s manual (opens in a new tab)

    Operating manual · 377 pages · 45.2 MB

    Find the manufacturer’s operating and maintenance reference for the named sewer-cleaner model.

    Application notes

    Use the manual matching the actual unit, serial number and fitted options. This reference does not replace operator training.

    Cleaning and jettingCrew safety

    Link checked: 2026-09-20

  • Vortex / Schwalm

    PDF

    Schwalm Talpa 1330 technical data sheet (opens in a new tab)

    Technical data sheet · 2 pages · 0.8 MB

    Review the named robot’s dimensions, tooling connections and operating specifications.

    Application notes

    Manufacturer model reference. Confirm the equipment and options proposed for your project.

    Robotic cutting

    Edition: 12-08-2025 (publisher notation)

    Link checked: 2026-09-20

  • Vortex / Schwalm

    PDF

    Schwalm Talpa 2060 technical data sheet (opens in a new tab)

    Technical data sheet · 2 pages · 0.8 MB

    Compare the larger robot’s configuration and technical specifications for cutting and reinstatement.

    Application notes

    Manufacturer model reference. Confirm the equipment and options proposed for your project.

    Robotic cutting

    Edition: 12-08-2025 (publisher notation)

    Link checked: 2026-09-20

  • Schwalm

    Web page

    Schwalm chisel-hammer attachment (opens in a new tab)

    Technical guide

    Read the manufacturer’s description of the attachment used to address suitable hardened obstructions.

    Application notes

    Manufacturer model reference. Confirm the equipment and options proposed for your project.

    Robotic cutting

    Link checked: 2026-09-20

  • Eastech

    PDF

    Eastech iTracker sensor and collection-system monitoring catalogue (opens in a new tab)

    Equipment brochure · 36 pages · 4.3 MB

    Find the iTracker sensor and suspended manhole installation on pages 6 to 11.

    Application notes

    CIT uses iTracker level sensors for sub-basin investigation. Other products, service guarantees and packages in this catalogue are Eastech offerings.

    Flow monitoringSmoke, dye and I&IAnnual maintenance

    Link checked: 2026-09-20

  • Eastech

    PDF

    Eastech iTracking guide book: sensors, installation and monitoring (opens in a new tab)

    Technical guide · 40 pages · 41.3 MB

    Review iTracker hardware, mounting examples, site setup and the manufacturer’s monitoring method.

    Application notes

    CIT uses iTracker level sensors for sub-basin investigation with rainfall comparison. Mounting must suit the actual manhole geometry. The guide’s product packages, analytics and performance claims do not establish CIT’s inventory, subscription or project deliverables.

    Flow monitoringSmoke, dye and I&IMunicipal planning

    Link checked: 2026-09-20

  • Eastech

    Web page

    Eastech iTracker product reference (opens in a new tab)

    Technical guide

    Review the sensor, onboard logging and manufacturer connectivity options.

    Application notes

    Project monitoring locations, reporting and connectivity are agreed with CIT.

    Flow monitoringSmoke, dye and I&I

    Link checked: 2026-09-20

  • Source One Environmental

    PDF

    TYGERPatch tee and wye lateral-seal technical sheet (opens in a new tab)

    Technical data sheet · 2 pages · 3.0 MB

    Review the lateral-to-main repair geometry and the manufacturer’s full-circumference and top-hat configurations.

    Application notes

    CIT offers TYGERPatch for suitable lateral junctions. The proposed configuration and repair extent belong in your project submittal.

    Lateral-connection repair

    Edition: April 2025

    Link checked: 2026-09-20

  • Source One Environmental

    PDF

    PipePatch sectional point-repair specification (opens in a new tab)

    Specification guideline · 5 pages · 0.4 MB

    Review the manufacturer’s sectional-repair materials, preparation, installation and inspection specification.

    Application notes

    Manufacturer system reference. Confirm the selected repair material and project submittals with CIT.

    CIPP point repair

    Link checked: 2026-09-20

  • Source One Environmental

    PDF

    PipePatch commercial point-repair sheet (opens in a new tab)

    Technical data sheet · 1 pages · 3.9 MB

    Review the sectional point-repair system and its commercial sewer applications.

    Application notes

    Manufacturer system reference. Confirm the selected repair material and project submittals with CIT.

    CIPP point repair

    Link checked: 2026-09-20

  • Source One Environmental

    PDF

    PipePatch fiberglass safety data sheet (opens in a new tab)

    Safety data sheets · 8 pages · 0.1 MB

    Review the manufacturer’s fiberglass material safety data for the named PipePatch component.

    Application notes

    Match each SDS to the actual product label, component and formulation supplied for the job.

    CIPP point repairLateral-connection repairCrew safety

    Link checked: 2026-09-20

  • Source One Environmental / Polinvent

    PDF

    PipePatch 3PS (Summer) resin safety data sheet, Part B (opens in a new tab)

    Safety data sheets · 13 pages · 0.3 MB

    Review the supplier-published safety data for the summer Part B resin formulation.

    Application notes

    This is an English European-format SDS supplied through S1E. Match the container label, formulation and jurisdiction; obtain the matching Part A SDS and current project-specific sheets from the supplier. This reference does not identify CIT’s selected resin for a particular job.

    CIPP point repairLateral-connection repairCrew safety

    Edition: July 24, 2024 · version 1.2 / EN

    Link checked: 2026-09-20

  • Source One Environmental / Polinvent

    PDF

    PipePatch 3PW (Winter) resin safety data sheet, Part B (opens in a new tab)

    Safety data sheets · 13 pages · 0.3 MB

    Review the supplier-published safety data for the winter Part B resin formulation.

    Application notes

    This is an English European-format SDS supplied through S1E. Match the container label, formulation and jurisdiction; obtain the matching Part A SDS and current project-specific sheets from the supplier. This reference does not identify CIT’s selected resin for a particular job.

    CIPP point repairLateral-connection repairCrew safety

    Edition: July 24, 2024 · version 1.2 / EN

    Link checked: 2026-09-20

  • Source One Environmental / Polinvent

    PDF

    PipePatch 3PX (Rapid) resin safety data sheet, Part B (opens in a new tab)

    Safety data sheets · 14 pages · 0.4 MB

    Review the supplier-published safety data for the rapid Part B resin formulation.

    Application notes

    This is an English European-format SDS supplied through S1E. Match the container label, formulation and jurisdiction; obtain the matching Part A SDS and current project-specific sheets from the supplier. This reference does not identify CIT’s selected resin for a particular job.

    CIPP point repairLateral-connection repairCrew safety

    Edition: July 24, 2024 · version 1.2 / EN

    Link checked: 2026-09-20

  • RELINE

    PDF

    RELINE Alphaliner 500G and 1800H technical sheet (opens in a new tab)

    Technical data sheet · 2 pages · 1.3 MB

    Compare two UV-cured glass-reinforced liner constructions in the manufacturer’s product sheet.

    Application notes

    UV-lining technology reference. This listing does not specify the liner supplier for your CIT project.

    UV CIPP lining

    Edition: May 2025

    Link checked: 2026-09-20

  • NASSCO

    PDF

    Cured-in-place pipe specification guideline (opens in a new tab)

    Specification guideline · 34 pages · 0.5 MB

    Review mainline CIPP design, submittal, installation and acceptance topics when preparing rehabilitation documents.

    Application notes

    Industry specification guideline for adaptation by your owner or engineer to the actual project.

    CIPP point repairUV CIPP lining

    Edition: 2023

    Link checked: 2026-09-20

  • NASSCO

    PDF

    CIPP lateral-seal specification guideline (opens in a new tab)

    Specification guideline · 17 pages · 0.1 MB

    Define requirements for the seal at the lateral-to-main junction.

    Application notes

    Industry specification guideline for adaptation by your owner or engineer to the actual project.

    Lateral-connection repair

    Edition: 2016 / 2020 publication

    Link checked: 2026-09-20

  • SewerAI

    Web page

    SewerAI Sewer3D manhole models and point clouds (opens in a new tab)

    Technical guide

    Review model, point-cloud and unfolded-wall viewing capabilities for recorded manhole interiors.

    Application notes

    CIT’s agreed assessment package controls your deliverables and access.

    Manhole assessment

    Link checked: 2026-09-20

  • SewerAI

    Web page

    Receive and download SewerAI digital submittals (opens in a new tab)

    Technical guide

    Learn how a recipient opens, reviews and downloads an inspection submittal supplied through PIONEER.

    Application notes

    Use this guide when your CIT project delivers a SewerAI digital submittal.

    CCTV and lateral launchManhole assessment

    Link checked: 2026-09-20

  • SewerAI

    Web page

    SewerAI training: manhole capture and deliverable review (opens in a new tab)

    Training reference

    Find the publisher’s Sewer3D and MACP workflow sessions, recordings and companion guides.

    Application notes

    Some training downloads may require publisher access or registration.

    Manhole assessment

    Link checked: 2026-09-20

  • NASSCO

    PDF

    Quality control for PACP, LACP and MACP surveys (opens in a new tab)

    Quality-control guide · 12 pages · 0.3 MB

    Review quality-control responsibilities for inspection records and coded surveys.

    Application notes

    Use the assessment program and edition specified for your project.

    CCTV and lateral launchManhole assessmentAnnual maintenance

    Edition: April 2022

    Link checked: 2026-09-20

  • NASSCO

    PDF

    Pipe condition assessment using CCTV: specification guideline (opens in a new tab)

    Specification guideline · 26 pages · 0.2 MB

    Plan inspection coverage, camera records, asset identification and electronic deliverables.

    Application notes

    Industry specification guideline for adaptation by your owner or engineer to the actual project.

    CCTV and lateral launchAnnual maintenance

    Edition: 2014 / 2020 publication

    Link checked: 2026-09-20

  • NASSCO

    PDF

    Sewer pipe cleaning specification guideline (opens in a new tab)

    Specification guideline · 30 pages · 0.3 MB

    Define cleaning scope, access, debris removal and project documentation.

    Application notes

    Industry specification guideline for adaptation by your owner or engineer to the actual project.

    Cleaning and jettingAnnual maintenance

    Edition: 2014 / 2020 publication

    Link checked: 2026-09-20

  • NASSCO

    PDF

    Manhole rehabilitation specification guideline (opens in a new tab)

    Specification guideline · 51 pages · 0.8 MB

    Review structure assessment, rehabilitation submittals, preparation and acceptance topics.

    Application notes

    The guideline covers multiple rehabilitation methods. CIT’s agreed scope identifies the actual treatment.

    Manhole assessmentManhole grouting

    Edition: August 2025

    Link checked: 2026-09-20

  • NASSCO

    PDF

    Sewer smoke-testing specification guideline (opens in a new tab)

    Specification guideline · 13 pages · 0.2 MB

    Plan smoke-testing coverage, notifications, field observations and reporting.

    Application notes

    Industry specification guideline for adaptation by your owner or engineer to the actual project.

    Smoke, dye and I&I

    Edition: May 2021

    Link checked: 2026-09-20

  • NASSCO

    PDF

    Smoke-testing data dictionary (opens in a new tab)

    Data reference · 11 pages · 0.1 MB

    Use the publisher’s field definitions when discussing a consistent smoke-testing record format.

    Smoke, dye and I&I

    Edition: Version 1.0, May 2010

    Link checked: 2026-09-20

  • Superior Signal

    PDF

    Superior Smoke sewer-testing technical guide (opens in a new tab)

    Technical guide · 9 pages · 0.9 MB

    Read the manufacturer’s explanation of sewer smoke testing and its field documentation.

    Application notes

    General method reference. Confirm the actual test product and public-notification wording for your project.

    Smoke, dye and I&I

    Link checked: 2026-09-20

  • NASSCO

    PDF

    Cross-bore inspection specification guideline (opens in a new tab)

    Specification guideline · 10 pages · 0.1 MB

    Plan sewer inspection coverage and documentation around utility installation.

    Application notes

    Industry specification guideline for adaptation by your owner or engineer to the actual project.

    CCTV and lateral launchSewer locatingCross-bore inspection

    Edition: 2018 / 2020 publication

    Link checked: 2026-09-20

  • NASSCO

    PDF

    Grouting unified safe operating practices (opens in a new tab)

    Safety guide · 30 pages · 2.1 MB

    Review the industry’s chemical-grouting safety reference and training topics.

    Application notes

    Use with the selected grout’s SDS, actual equipment instructions and the employer’s site procedures.

    Manhole groutingCrew safety

    Edition: 2022

    Link checked: 2026-09-20

  • NASSCO

    Web page

    Manhole grouting and rehabilitation methods (opens in a new tab)

    Technical guide

    Compare leakage-control and structural-rehabilitation approaches for manholes.

    Application notes

    CIT’s established grouting service treats suitable leakage locations; additional systems require a defined project scope.

    Manhole assessmentManhole grouting

    Link checked: 2026-09-20

  • TRUVAC

    PDF

    TRUVAC HXX hydro-excavator specification sheet (opens in a new tab)

    Technical data sheet · 2 pages · 0.9 MB

    Review a manufacturer’s hydro-excavator configuration for water excavation and vacuum recovery.

    Application notes

    Manufacturer model reference. Confirm the equipment and options proposed for your project.

    Hydro excavationSewer locating

    Edition: August 2026

    Link checked: 2026-09-20

  • U.S. EPA

    PDF

    CMOM guide for sanitary sewer collection systems (opens in a new tab)

    Municipal planning guide · 126 pages · 2.6 MB

    Review collection-system capacity, management, operation and maintenance program elements.

    Application notes

    Dated federal guidance, January 2005; use with your current permit and local requirements.

    Cleaning and jettingFlow monitoringSmoke, dye and I&IAnnual maintenanceMunicipal planning

    Edition: January 2005

    Link checked: 2026-09-20

  • U.S. EPA

    PDF

    CMOM program self-assessment checklist (opens in a new tab)

    Checklist · 27 pages · 0.2 MB

    Review your collection system’s management, maintenance, inspection and response arrangements.

    Application notes

    A planning checklist, not a compliance certification.

    Annual maintenanceMunicipal planning

    Link checked: 2026-09-20

  • NEIWPCC / U.S. EPA

    PDF

    Optimizing operation, maintenance and rehabilitation of sewers (opens in a new tab)

    Municipal planning guide · 229 pages · 1.3 MB

    Read the reference chapters on collection-system operation, maintenance and rehabilitation.

    Application notes

    Historical technical guidance; confirm current project and regulatory requirements.

    Cleaning and jettingSmoke, dye and I&IAnnual maintenanceMunicipal planning

    Edition: December 2003

    Link checked: 2026-09-20

  • ASCE / U.S. EPA

    PDF

    Collection-system maintenance frequency and performance (opens in a new tab)

    Municipal planning guide · 146 pages · 0.8 MB

    Review the published study on maintenance frequencies and collection-system performance.

    Application notes

    Research reference; its example frequencies are not a CIT maintenance commitment.

    Cleaning and jettingAnnual maintenance

    Edition: February 1999

    Link checked: 2026-09-20

  • U.S. EPA

    PDF

    Asset management for sewer collection systems (opens in a new tab)

    Municipal planning guide · 16 pages · 0.6 MB

    Connect your asset inventory, condition information and maintenance priorities to capital planning.

    Annual maintenanceMunicipal planning

    Link checked: 2026-09-20

  • NASSCO

    Web page

    PACP, LACP and MACP program information (opens in a new tab)

    Training reference

    Read the distinctions between pipeline, lateral and manhole assessment programs and find credential information.

    Application notes

    Program information does not establish a particular individual’s current certification.

    CCTV and lateral launchManhole assessmentMunicipal planning

    Link checked: 2026-09-20

  • CPWR

    PDF

    CPWR trenches: risks and prevention fact sheet (opens in a new tab)

    Safety guide · 2 pages · 0.4 MB

    Review trench-collapse risks and find handouts, planning tools and training references for crew safety discussions.

    Application notes

    Reference guidance for excavation planning. Employer procedures, the competent person’s assessment and applicable requirements govern the actual excavation.

    Hydro excavationSewer locatingCrew safety

    Link checked: 2026-09-20

  • Peoples Gas

    Web page

    Gas utility guidance for suspected sewer cross-bores (opens in a new tab)

    Safety guide

    Read the utility’s explanation of gas lines crossing sewers and the hazard during blockage clearing.

    Application notes

    Contact the utility responsible for your location. This publisher’s service territory and phone numbers are not CIT’s.

    Cleaning and jettingCross-bore inspectionCrew safety

    Link checked: 2026-09-20

  • Common Ground Alliance / 811

    Web page

    Contact your state’s 811 center before excavation (opens in a new tab)

    Safety guide

    Find the appropriate state notification center and its current digging requirements.

    Application notes

    Camera/sonde sewer locating and exposure of one point do not replace required utility notification.

    Hydro excavationSewer locatingCrew safety

    Link checked: 2026-09-20

  • CIT Sewer Solutions

    Web page

    CIT sewer inspection planning guide

    CIT planning aid

    Gather sewer maps, asset identifiers, inspection goals and reporting requirements before discussing your project.

    CCTV and lateral launchMunicipal planning
  • CIT Sewer Solutions

    Web page

    CIT crew qualifications and project preparation

    CIT planning aid

    Review the qualification and coordination questions that belong in your sewer project discussion.

    Municipal planningCrew safety
  • CIT Sewer Solutions

    Web page

    Grinnell sewer point-repair case study

    Case study

    Read the documented CIT repair example and its stated evidence and measurement limits.

    CIPP point repairMunicipal planning
  • Kingscote Chemicals

    PDF

    Bright Dyes yellow/green tracing-dye technical sheet (opens in a new tab)

    Technical data sheet · 1 pages · 0.0 MB

    Review the manufacturer’s fluorescent tracer product information for connection and water-path investigations.

    Application notes

    Manufacturer reference. CIT confirms the actual test product for the project; match the SDS to the supplied container.

    Smoke, dye and I&ICrew safety

    Link checked: 2026-09-20

  • Kingscote Chemicals

    PDF

    Bright Dyes Sewer YG liquid safety data sheet (opens in a new tab)

    Safety data sheets · 6 pages · 0.5 MB

    Read the safety data for the specifically named Sewer YG liquid tracing dye.

    Application notes

    Manufacturer reference. CIT confirms the actual test product for the project; match the SDS to the supplied container.

    Smoke, dye and I&ICrew safety

    Link checked: 2026-09-20

  • Kingscote Chemicals

    Web page

    Bright Dyes technical and safety data library (opens in a new tab)

    Safety data sheets

    Find the matching technical and safety sheet for the dye’s color, formulation and liquid, tablet or powder form.

    Application notes

    Manufacturer reference. CIT confirms the actual test product for the project; match the SDS to the supplied container.

    Smoke, dye and I&ICrew safety

    Link checked: 2026-09-20

01

Bring your asset list and reporting requirements to the project discussion.

Your sewer maps, manhole and pipe identifiers, previous inspection records and known access restrictions help us identify the locations your crew needs inspected, cleaned or repaired. Tell us which report formats, condition codes and completion records your engineer requires.

For rehabilitation, request the proposed product data, applicable safety data sheets, installation requirements and acceptance records for the selected system. Your engineer’s specifications and the agreed proposal establish the project requirements.

Project documents

Request the documents your sewer project needs.

Tell us your project location, the sewer assets involved and the specification or submittal you need. We can discuss the proposed inspection, cleaning or repair scope with your staff and engineer.

Call 515-434-2248